The library project is coming along. I work on it a little almost every evening. Since I last wrote, I applied a finish to the maple banding on the bookcases. The main trim has also been installed for the bookcases and the window seating, as well as the decorative trim on the seating.
The window seating will have storage, so I’m working on the lids for that at the moment. After that, I’ll buy/install the shoe molding and a few other trim pieces and then get things prepped for painting.
I do not have the top of the bookcases figured out yet. Something definitely needs to be done. I’m kicking around some ideas so we’ll see what sticks. Before I do that, I think I’m going to clean everything and reorganize all of the books.