This evening, Brian and I ran the wires for the wall sconces. So, that puts us in a good position to have the bathroom workable by Thanksgiving. We need to have the electrical stuff totally done by the end of this weekend in order for my revised schedule to work.
Lowe’s sent two delivery guys to the house today to pick up our vanity top. Brian talked to a real manager there yesterday and he says the holes can be plugged and new ones drilled. We’ll see. From what I’ve been reading about Corian, it does sound possible. Supposedly the turnaround time is going to be a week. We’ll see about that, too. We did learn one lesson–don’t even bother calling Lowe’s on a weekend if you have a problem with something. Waiting till Monday to call surely would’ve saved Brian a few points on his blood pressure.